Production of nuclear reactors

23 power units

planned to be put into operation by 2032.

0 events

level "1" ("anomaly") and higher according to the international scale INES
AEM-Technologies is the only company in the country that supplies a complete set of nuclear steam generating plants for Russian and foreign nuclear power plants. The unique competencies mastered in the process of manufacturing large-sized nuclear equipment allow us to manufacture products of the highest quality for other industries, including petrochemical industry.

What parts does the reactor consist of?

A nuclear reactor is one of highly sophisticated facilities, the construction of which requires close adherence to all production process standards and strict control at every stage. The reactor consists of several parts - the reactor vessel and internals. Each part solves its own important task and has unique characteristics. Watch a short video to learn more about the design of a nuclear reactor.

Production volumes

Nuclear reactors

6

shipped in the last 5 years
0
2019
3
2020
1
2021
0
2022
2
2023

Safety

Ensuring the highest level of NPP safety is a key priority of AEM-Technologies in the construction of nuclear reactors
Modern nuclear reactors VVER-1200 and VVER-TOI are equipped with many active and passive safety systems independent of each other, which, even in the event of a severe accident, reduce the probability of radiation escape outside the sealed reactor compartment to almost zero.
0 events
level "1" ("anomaly") and higher according to the international scale INES
72 hours
time to ensure independence of the plant operation in case of beyond design basis accident

III+ generation

reactor, which has no analogues in the world, was first launched at the Novovoronezh NPP in 2017.
More
History of pressurized water reactors
VVER-210
VVER-440
VVER-1000
VVER-1200
VVER-TOI

VVER - 1200

VVER - TOI

The basic model of a water-cooled power reactor surpasses the previous generations in terms of power, safety and reliability. Compared to VVER-1000, the service life of VVER-1200 is doubled.

3 200 MW

Thermal power

1 200 MW

Electric power

60 years

Life cycle

35,9

Efficiency (Efficiency factor)

8 power units

built

13 power units

planned to be built by 2031
See also: